Tag Archives: Il-112V

The State of VTA

News on the Il-76MD-90A program provides an opportunity to look at the state of Russia’s VTA, or Military-Transport Aviation.

il-76md-90a-prototype-prepares-for-takeoff

Il-76MD-90A prototype prepares for takeoff

The Il-76MD-90A is a new aircraft, an updated version of the venerable Il-76 transport produced by the Soviets in large numbers during the 1970s and 1980s.

According to most sources, the VTA is supposed to acquire 39 Il-76MD-90A transports by 2020 [or 2021?].  This may have been slashed to 30, others say.  Manufacturer Aviastar-SP reports it has ten of the aircraft in various stages of assembly.

The new transport was at TsAGI in Moscow recently for static structural testing. Prior to that, it conducted flight tests from the Aviastar-SP production facility at Ulyanovsk-Vostochnyy.

Besides new PS-90 engines, the Il-76MD-90A has an all-glass digital cockpit, new flight controls, navigation, and communication systems.  The airframe and landing gear have been reinforced.  It lifts 60 tons while reportedly consuming less fuel.

The original Il-76 had slightly greater cargo capacity than the U.S. C-141.  It’s critical to the mobility of Russia’s Airborne Troops (VDV) and their air-droppable equipment.  Civilian versions of the Il-76 remain in use worldwide.

At present, VTA may operate about 100 Il-76M or Il-76MD, and perhaps ten An-124 transports.  But the number of operational aircraft could be as low as 60 Il-76 variants and a handful of An-124. 

At the outset of the current GPV in 2011, the air forces hoped to procure 100 or more new and updated heavy transport aircraft.  The current inventory needs complete replacement in the 2020s and early 2030s.  But they have relatively little to show well into 2017.

Together with 39 (or 30?) Il-76MD-90A transports, VTA plans to acquire 30 Il-76MDM aircraft.  It’s a renovated Il-76MD with its original engines but the glass cockpit and other updates from the Il-76MD-90A.

Cooperation with the Antonov design bureau and its production facilities is off the table now that military-industrial ties with Ukraine have been severed. Observers once looked for Russia’s VTA to buy 30-50 An-70 transports and the same number of Il-76MD variants and updates.

They also anticipated that Moscow would buy 20 new An-124 aircraft and modernize quite a few existing ones.  No alternative for replacing the super-heavy transport has been proffered.

The PAK TA (future aircraft system — transport aviation) remains a mirage. Moscow could mobilize Aviastar-SP to renew production of the An-124, but it would require a lot of resources and time, plus the facility will already have its hands full with the Il-76MD-90A, etc.

There is also the question of VTA’s smaller transports which are ancient and in dire need of replacement.  The MOD has settled on procurement of 48 turboprop Il-112V aircraft in GPV 2018-2025 to replace some of its aged An-26 fleet.  This decision came after it abandoned efforts to get Antonov’s An-140.  The Russians reportedly will continue to develop the turbojet Il-214 medium transport despite India’s decision to bow out of the once joint effort.  But there’s little tangible in this program to date.

Il-112V Light Transport in Next Armaments Program

The Voronezh Aircraft Plant is assembling the first prototype of the Il-112V light transport aircraft, according to the Ilyushin design bureau.  Russian Deputy Defence Minister and procurement tsar Yuriy Borisov has indicated that the Russian military will buy 48 of them in the state armaments program for 2018-2025, expected to be approved by mid-2017.

first-il-112v-fuselage-assembled-photo-www-ilyushin-org

First Il-112V Fuselage Assembled (photo: http://www.ilyushin.org)

The first Il-112V airframe should be complete by the end of January when ground testing is to begin.  Flight tests could start this summer followed soon thereafter by state acceptance testing, Borisov told Gazeta.ru’s Mikhail Khodarenok.  The Voronezh plant has also begun assembly of a second Il-112V.

The new transport will take the place of aging Antonov An-26 / Curl aircraft.  The Russian military still operates about 100 of the venerable transports.  More than 1,100 were produced between 1969 and 1986.

Series production of the Il-112V is supposed to start in 2019 with a rate of 12 aircraft per year.  The production run has been pared back to 48 from the original target of 62 transports.

Funding for Il-112V development was cut in 2010 when former defense minister Anatoliy Serdyukov opted to buy modified An-140 transports from Ukraine.  But the Russian light transport program was revived in 2013.  It received special impetus after Kyiv halted military-technical cooperation with Moscow in early 2014.

The Il-112V depends on successful production of TV7-117ST turbofan engines by Russian manufacturer Klimov.  The first two are scheduled for delivery and installation on the prototype airframe in February.  The Klimov engines will substitute for ones that Moscow used to import from Ukraine’s Motor Sich. However, they are not equal to Ukrainian engines in several respects including horsepower, service ceiling, and reliability, according to Khodarenok’s aviation sector sources.

The new Russian transport is designed for a takeoff weight of 21 tons with a maximum useful load of five tons.  It will carry 3.5 tons to a range of 2,400 km.

artists-concept-of-il-112v

Artist’s Concept of Il-112V

According to a recent report in Izvestiya, the Central Aerodynamic Institute (TsAGI or ЦАГИ) has raised the prospect of developing a different Russian light transport that could be rapidly converted between passenger and cargo variants.

Outside Russia, there are some 600 An-26 transports still operating, but they are at the end of the service lives and need replacement.  This provides a ready market for Ilyushin’s new light transport, but it already faces stiff competition from established products like the Airbus CASA C-295 and Alenia C-27J Spartan.

The Il-112V is an increasingly critical requirement given the obsolescence of Russia’s existing light transport inventory.  The urgency of the program is further underscored by Russia’s apparent difficulties in producing components to assemble the Ukrainian-designed An-140.